Shopping mall, HVAC,
Austria

Ventilation solution in a shopping mall environment

Summary:
Dismantling and removal of the old air handling equipment, followed by installation of the new equipment inside the machine room.

Challenge:
Due to the site conditions, the equipment could not be lowered into the machine room in one piece. Disassembly was required, the elements had to be transported separately and then reassembled on site. The metal structure of the rotor unit did not fit on the access route, so it had to be cut into several parts. These sections were re-welded with great precision at the installation site in order to ensure that the operation and performance of the equipment were not impaired.

rotor légtechnika